Sunday, October 12, 2014

An update on the project


I have done some more work on the project.

I have installed the smoke stacks with adjustable caps.

I have installed the handles to the lids.

I have cut the air vents and I will install the adjustable slide covers for air control.

I installed two rack runners per side and will have space to put more in when I need.

I have cut the opening for the fire doors and working on the hinge part.

I have to install the thermostats, install the toggle clamps and hinges for the doors, and paint. 






No comments:

Post a Comment